SOCIAL SECURITY OFFICE

Construction of the office building and underground parking.

Ordered by: Social Security (Bituach Leumi)

Planning and construction of the office building on an area of 6000 m² + a 7000 m² parking garage. Excavation and reinforcement of walls, massive foundation work in special conditions (ground water, access problems, traffic), office building including high level systems and the “last word” in VRF air conditioning systems to save energy and green construction, dry method stone facings.

BNAI BRAK RAILWAY STATION

Station building, platforms and rails.

Ordered by: Israel Railways

Construction of the Bnai Brak railway station building, construction, systems and infrastructure work, rail installations, platform and pedestrian access tunnel.

MEDICAL INSTITUTES – HILLEL YAFFE HOSPITAL

Construction of the medical institute buildings

Ordered by: The Ministry of Health

Medical institutes on an area of 6000 m² including complex plumbing systems, osmosis, dialysis, pneumatic mail and air conditioning systems, smoke detection and fire extinguishing systems, advanced, complex communications systems, acoustic ceiling and complex concrete elements in innovative construction.

MISHAN SENIOR LIVING FACILITY – RAMAT EFAL

Construction of the nursing home hospital.

Ordered by: Mishan Senior Living Facilities

A structure on 12,000 m². The building is intended for the nursing departments of the geriatric center. A 4 -story, specially textured stone-covered structure. Hospitalization rooms, medical gas systems, electric systems and air conditioning, building management system and communications, a complex, impressive structure.

YAD VASHEM SCHOOL OF HOLOCAUST EDUCATION

Construction of the School of Holocaust Education and the auditorium.

Ordered by: Yad Vashem Museum

Constructing the new wing of Yad Vashem’s School of Holocaust Education.

Construction work, electromechanics systems for building a 5-story structure for the new wing of the School of Holocaust Education on 5000 m² including site development work and a service access. The work included elements of high-finish, exposed architectural concrete and stone facings.

Drainage infrastructure and smart lighting, international-regulation natural and synthetic soccer fields.

DEPARTMENT OF MICROBIOLOGY – HADASSAH EIN KEREM

Construction of the laboratories.

Ordered by: The Hebrew University

A complex 15,000 m² structure composed of graded levels on a rocky hill including basement, high level finishing including stone facing and a smart laboratory building.

TEDDY STADIUM SOUTH STANDS

Construction of the southern stands of Teddy Stadium in Jerusalem. The job included constructing the southern stands, complex prefab concrete work, activity rooms and systems.

Ordered by: The Moriah Company for the Development of Jerusalem

Construction of the southern stands in Teddy Stadium, including 10,500 seats, preparation of the lighting system, loudspeaker system, unique filming system, expansive parking, a cutting-edge, equipped press area, as well as renovation of the staff and players’ dressing rooms.

The project included complex prefabricated elements, some of which were cast on site and some in the factory, including saw-tooth roofs and prefab seats in various sizes and cuts, steel constructions for the roof, electromechanics systems including low tension electricity, plumbing and air conditioning, extensive stonework from complex elements.

PSYCHOLOGY CENTER – BEN GURION UNIVERSITY

Constructing the Humanities building at Ben Gurion University, classrooms, and auditorium.

Ordered by: Ben Gurion University of the Negev

A monumental, unique building of 7000 m², complex concrete constructions, fronts coated with industrialized precasts (first of its kind), aluminum screens, ultra-high tension electrical systems and plumbing.

THE DILLER BUILDING – BEN GURION UNIVERSITY

Building for Humanities and Social Sciences

Ordered by: Ben Gurion University of the Negev

A momumental, architecturally unique building covering an area of 7000 m². The building is of complex concrete construction, fronts coated with industrialized precast (the first of its kind) of both concrete and special wood, aluminum screens, electrical systems, plumbing and special suspended ceilings of wood.

THE COLLEGE OF MANAGEMENT – RISHON LETZION

Building the School of Communications, the auditorium and the library.

Ordered by: The College of Management

Constructing three buildings, the School of Communications, the auditorium and the library, which also include food courts, lecture halls and radio broadcasting areas, composed of 3 stories and a joint basement, on a total area of 16,000 m². The project included acoustic rooms used for the television and radio studios, lecture halls, classrooms and hallways with superior finishing. A 500- seat auditorium, sitting areas and computer stations in the library as well as development and gardening works. The buildings boast special fronts and coatings such as “forest fronts” with large, geometrically-shaped openings, aluminum FALZONAL coating and cement board coatings employing the dry method.